Can a compressed air leak survey save your shop $10,000 to $50,000?

 Yes it can…

Try  spending the money you save from a good air leak survey on some tools to keep you out of the breakdown mode.

Air leak nozzle 1

Scenario #1      200 HP of compressed air, 100 HP full time and 100 HP as backup. house pressure is 107 to maintain 100 PSI throughout the system. 150 gallons of accumulation, typically we like to see 4 gallons per HP. This is a 3 shift operation  300 days per year. Operations include machining centers, screw machines and plating.

 

Over $50,000.00 of wasted air leaks were found, nearly 17% of their total energy bill.

 

Scenario #2   40 HP plus 25 HP 90% loaded at 110 PSI.    200 gallons of accumulation was available. This operation ran 3 shifts per day and 360 days per year. This anodizing operation was greatly automated, lots of air controls.

Over $18,000.00 were found in wasted compressed air.

 

Typically we find between $80 – $160 dollars per Horsepower per shift in waste. How many Horsepower does you shop run.  Leaks are cheap to find with the right equipment and cheap to fix.

 

How could you use an extra $10,000 to $50,000 per year to grow your business or improve your maintenance department?

Give me a call at the Maintenance Geek LLC to find out more.

snapshot_001

 

Thanks,                                                                                                                 Robert   “The Maintenance Geek”

(203) 510 – 8575

What is EUA? And why should I care?

Energize CT’s EUA has been created as an economic development initiative for the manufacturing sector.

logo

Sponsored by Eversource the assessment helps manufacturers qualify and identify specific energy reduction opportunities and the efficient measures needed to reduce kWh and CCF consumption. This study that looks at how much, where, and when you use energy.

This assessment will include an overview of the following areas:

 Motor Systems,

 Air Compressors

 HVAC Systems

 Process Equipment

 Lighting

 Other significant energy-consuming areas.

Once the study is complete, an Energy Usage Assessment (EUA) analysis with recommendations is provided. A fixed price for work for each project is reviewed by the utility and customer for approval. The proposal will include all the Energize Connecticut incentives such as; a 50/50 cost sharing for the EUA program and potential reimbursement for implemented Energy Opportunities.

10 – 20 % in potential energy cost reductions

Detailed analysis of your energy use and costs

Identification of “Idle Load” energy waste

Efficiency analysis of facility systems.

Equipment upgrade recommendations

ECM financial impact and ROI analysis

Access to programs,resources, and funding.

Each event will consists of: Training                                                                                                                                                             Assessment                                                                                                                                                       Analysis

 

 

Click in the upper right corner to get each blog episode sent to you when it becomes available.

Or contact me for more info on any of the Energize CT programs.

 

snapshot_001Robert Kravontka

The Maintenance Geek

robert@maintenancegeek.com

What are the 6 steps to optimize your compressed air system?

Engineered Air Nozzles by EXAIR

 

Compressed air leaks, and inefficient blow offs can waste thousands of dollars of electricity each year. This affects your companies production costs and bottom line.

 

 

What are the 6 steps to optimize your compressed air system?

  • Determine the main compressed air users in your facility
  • Find and fix the air leaks with Ultrasonic Leak Detection
  • Upgrade your blow off and cooling operations with engineered products for less air use and lower decibel levels.

     High efficiency nozzles                                                                                                                    High efficiency air knives                                                                                                                  High efficiency  blow offs

  • Turn off compressed air when not in use, or put it on a timer to only run when required
  • Use intermediate storage next to the point of use
  • Control the air pressure near the point of use.

exair_footerThe Maintenance Geek LLC is proud to be a stocking distributor for Exair the home of intelligent compressed air products

 

E Mail me for a catalog and to get 10% off of current pricing.     robert@maintenancegeek.com

 

Click in the upper right hand corner to get this blog sent to you as soon as it is published.→

 

Robert Kravontka    “The Maintenance Geek ”

snapshot_001

 

 

Step “One” in Developing a World Class Maintenance Organization

Snapshot_24

 

Step One:

It’s the same for big companies or smaller ones, you need to figure out where you are and what your up against. If you have only one maintenance professional that does the facility and all the equipment but only when it breaks down the issues are the same.

You must start with some data. 

Think of it as a doctor’s visit. Your doctor will not prescribe a medication or solution before he examines you and collects some data. At a minimum, blood pressure, weight, temperature, and what “you” think is wrong?

Should it be any different trying to diagnose your maintenance process, before you prescribe some remedies?

Collect Data.        Simple Stuff.

What are your critical pieces of equipment? Look for the top 3-5 and learn about them.

Rate them in order of criticality. How much trouble will you be in when they go down, and how expensive will they be to get back up. It is a lot cheaper to keep them running than to fix them after they go down.

What skills are at your disposal?   You may be surprised at some of the hidden talent.

What do you need to do to keep the equipment running vs. trouble shooting it and fixing it? Get out of the breakdown mode.

OEE is more important as you start to flow your products.  If one component of the cell stops, the entire cell stops. OEE multiplies as more equipment is added to a cell.

 Evaluate your maintenance department. Are they doing the right things, can they be doing better PM’s and 7less “time” based preventive maintenance? How about some predictive maintenance to catch the issues before they bite you.       

 

 

 

 

gauge with marker

 

Consider training your operators to be the eyes and ears for maintenance, put in some visuals to make it easier for them.

 

Its not easy when you have a small maintenance group, but neither are the bigger ones, that’s why “they” make the medium bucks.  The principles are the same.       Breakdowns are 5 – 10 times more expensive than preventing a breakdown.

 

Want to know more, go to the upper right and sign up for the next exciting episode of the Maintenance Geek Blog.

 

cropped-snapshot_001.jpgRobert Kravontka

The Maintenance Geek

robert@maintenancegeek.com

Does your business have a good plan to Grow? How the Business Sustainability Challenge can help!

 What is the “Business Sustainability Challenge” and why should I care?BSC

New England Utilities offer the Business sustainability Challenge. With a small team your company can become more competitive by taking a strategic look at Energy, Workforce, Operations, and Waste Streams. Results from this planning include reducing risks and leveraging opportunities to shield your company from, changes in the economy, while improving operations and profitability. The utility will fund this effort 100% and offer incentives to grow along the way. You need to supply a small team, 3-5 people to develop a growth strategy with help from some of the great teachers in the industry.

Send me a note, and I will send you a form, to see if your company qualifies.

We have seen some great results.  Let me know if you want to find out more.

 

Robert                                                                                                                                                          The Maintenance Geek

snapshot_001Click in the upper right to sign up for the blog series.

What is on tap for the Maintenance Geek?

beer-tap

Are your Best Maintenance People retiring this year?

Do your younger maintenance professionals need to work smarter not harder?

The issue most companies with manufacturing equipment face is how to                                          get out of the breakdown  mode.

Over the next 6 months we will discuss the 5 steps to get out of the breakdown mode.

Over the next 6 months we will discuss the steps and what will work for you.

 

Expect a June 2016 release of my new E – Book   “5 Steps to get out of the Breakdown Mode”.

Snapshot_24

We will talk about what the Utilities and Government can do to help fund our efforts to get out of the breakdown mode.

There are also steps you can take right away, to generate income to pay for your journey and get buy in from senior management.

 

Stay tuned.

snapshot_001

Let me know what you think!